Friday, November 9, 2012
Update on the Bowers home
Here are some new pictures of the house. The real roof is on now. It really has all of the outside framing completed and windows are in. I like this look because it shows the cool architecture. Inside they have completed the electric rough in, the plumbing, rough in, and the cable/tv/telephone lines rough in. The place is really starting to take shape. I have included a picture of the arch over the fireplace. The fireplace is also in. It is exciting to go there and walk through each day and see new things done. All of the people MacDonald contracts with are so nice and professional. If we see something that we don't like they are really good about changing it. They even sweep up when they are done and throw their trash in the container outside. It is nice when you have a good feeling about those who are working on your house.

Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment